Golf R&D Process
Production lead time&Production Capacity
-
Production capacity: 180,000pcs/month
Production lead time: 45 days
-
Production capacity: 45,000pcs/month
Production lead time: 60 days
-
Production capacity: 50,000pcs/month
Production lead time: 60 days
-
Production capacity: 90,000pcs/month
Production lead time: 70 days
GOLFProduct Mechanical Equipment
-
Laser welding equipment 1 unit
Power:200-300w
Daily Capacity:1,000-2,000pcs
-
PLASMAWelding equipment 8 units
Daily Capacity:3,000-6,500pcs
-
Automatic angle adjuster - under development and testing
Self-developed to reduce human measurement errors and improve measurement accuracy.
-
Automatic sandblasting machine
Reduce the appearance differences of human work and improve the aesthetics of products.
-
Automatic coating baking line
Realize pipeline operation, fast baking, and improve process fluidity.
Silver Hot-Stamp Water Transfer | 3DWater Decal | Laser Engraving
-
XOptical Inspection Machine
Number of inspections per day:500 pcs
Maximum inspection size:1,200 x 800 x 1,200mm
-
Laser Engraving
Light Fiber:5unit(s)
Semiconductor:4unit(s)
CO2 :2unit(s)
Quantity per hour processed 50~120pcsUnequal. According to design style requirements.